Customer Support

Main number
+82-42-939-7000
A/S number+82-80-939-7070
+82-10-8833-8461
+82-10-8833-8463
+82-10-8833-8437
FAX+82-42-367-7006
E-mailcs@sehwa.biz

High Speed Railway System

Integrated Monitoring System for Signal Control equipments (Honam High Speed Railway)
Train control system (ATC, IXL) in Honam high-speed railway section, and system for remote integrated monitoring of the status and failure information of safety equipments and power supplies in real time from maintenance console.
Collect real-time information from train control systems and safety equipments, power supplies and point monitoring devices, TLDS, ATC remote speed control devices, ATC remote recovery devices
- Data Analysis/Determination/Saving
⊙ ATC : Automatic Train Control, IXL : Interlocking System
Integrated monitoring system for signal control equipments
(metropolitan high-speed railway)
A system that remotely integrates and monitors the condition and failure information of the train control system (ATC, IXL) and safety equipments and power supplies in the high-speed railway section of the metropolitan area in real time.
Collect real-time information from train control systems and safety equipments, power supplies and point monitoring devices, TLDS, ATC remote speed control devices, ATC remote recovery devices
- Data Analysis/Determination/Saving